How Long Do Custom Tap Handles Take? Lead Times Explained

Pouring beer from a custom tap handle on release day

Lead times · Tap Handles To Go

How long do custom tap handles take? About 5 business days after art approval for most pre-made shapes, and typically 30–60 days for full custom 3D. Here is what moves the calendar and how to plan back from the first pour.

No minimums

On pre-made tap handle shapes. Order one or a hundred.

5 business days

Typical build time on most pre-made shapes, once you approve the art.

From $21.49 CAD

Per handle at 100+ on standard shapes ($23.49 at 50+).

Custom tap handle lead time cheat sheet

Type Typical time Minimum
Pre-made shapes (UV-printed) About 5 business days after approval None
Curve, Hanger and Tall Boy Same as other pre-made shapes None
Laser-cut Confirmed in your quote 50
Full custom 3D Typically 30–60 days 50
Custom tap handles on a taproom tower ready for a new beer release
Plan handle lead time on the same calendar as your can art.

What slows down custom tap handles

  • Slow art approvals
  • Debating colours without physical samples
  • Adding sides or changing the finish after the proof
  • Shipping distance after the handles are made

Lead time by tap handle path

Pre-made tap handle shapes

Premade / stock shapes (including wood and stocked 3D shapes such as The Curve, The Hanger, Shotgun Short, Tall Boy and Short Boy): no minimums — order one at a time, with price breaks on larger orders. About 5 business days. From $21.49 CAD at 100+. Your art is UV-printed on painted wood.

Learn more →

Laser cut tap handles

Laser-cut handles: 50-handle minimum. We laser cut (or saw) the wood, paint it white, then print your art on it.

Learn more →

Full custom 3D tap handles

Full custom 3D: 50-handle minimum, typically 30–60 days. We 3D print it in resin, in-house, when your brand is the shape.

Learn more →

Standard 3/8"-16 ferrule

The ferrule is the threaded insert that screws onto the faucet. Ours fit standard North American faucets.

Learn more →

Custom paint: Custom paint colours are available on any handle for an extra charge. Ask us for a quote.

Planning a beer release around tap handle lead time

So, how long do custom tap handles take for your release? Work backward from the first pour.

  • Need handles in two weeks? You are in pre-made territory. That's our quick turnaround tap handles lane. Even custom tap handles with no minimum can make that.
  • Want a 3D sculpt for the debut? Start about a month out, and approve proofs quickly.

“Work backward from the first pour.”

Lead times vs traditional mold shops

Many mold shops take more than a month and want big orders. Our pre-made shapes exist so craft beer calendars can keep moving.

Tap handle lead times at a glance

Type Minimum Typical time Price
Pre-made shapes (UV-printed) None About 5 business days From $21.49 CAD at 100+; $23.49 at 50+
Laser-cut 50 Confirmed in your quote Ask via Get a Quote
Full custom 3D (resin) 50 Typically 30–60 days Ask via Get a Quote
Row of custom beer tap handles produced on a short lead time
Pre-made shapes take about 5 business days.

Building a shared calendar with marketing

Put proof due dates on the same calendar as your can art deadlines. Handles are often the last thing anyone remembers. That's how people end up asking for a five-day miracle on a thirty-day sculpt.

  • Add the handle arrival date to distributor kickoff meetings. Bars notice when everything shows up except the tap handle.
  • Leave time for shipping, especially to remote spots in Canada or the US. "Made" is not the same as "on the tower."
  • Have a date that can't move, like a festival or anniversary pour? Tell us in your first Get a Quote message, not the day before.

Communication that keeps tap handle timelines honest

Tap handle production time starts after approval. Here is the order things happen:

  1. Quote, with your pour date
  2. Art received and checked
  3. Proof sent
  4. Written approval
  5. Production starts
  6. Ship notice with tracking

If any step stalls, everything after it moves. We would rather reset the date than pretend everything is fine.

Releasing several beers? Approve them separately, so pre-made seasonals aren't stuck waiting on the 3D hero proof. You can run both paths at the same time.

Example planning offsets (illustrative)

Say pour day is Day 0.

  • Approve pre-made art by about Day −10.
  • Approve 3D art several weeks earlier to protect the 30-day build.
  • Shipping comes after production.

Adjust for weekends and how fast your team really approves things. Be honest.

Tap handle timeline myths

  • Myth: "The art is basically done, so you can start tomorrow." Fact: Production starts after you approve a print-ready proof in writing.
  • Myth: "3D printing happens overnight." Fact: Printing, finishing and checking a 50-piece run is typically 30–60 days.
  • Myth: "Shipping is instant." Fact: Getting from BC to your door still takes time.

Use the cheat sheet at the top of this post. And put your pour date in the first Get a Quote message.

Got a pour date?

Put it in your first message. We will tell you honestly which path makes the date.

Get a Quote →